Projects

Main Menu

Replacement ABP Incineration Plant

We are in the process of finalising design details for a replacement of our existing animal by-products (ABP) incinerator at our Cambridge site. We have planning consent for the incinerator and intend to procure a facility with a capacity to incinerate up to 500kg per hour of ABP.

The incinerator will be equipped with state of the art features including:

  • 1600°C grade hot face refractory lining
  • Calcium silicate insulation
  • Temperature controlled burners
  • Hydraulically operated hearths in cascade
  • Forced combustion air
  • Excellent fuel efficiency

Novus are fully insured, compliant and accredited

At Novus Environmental, we guide the disposal of all waste types. With a thorough understanding of your needs, we deliver industry-leading solutions.

Useful Links
HEAD OFFICE

A505 Main Road Thriplow, Heath, Nr. Royston, Hertfordshire SG8 7RR

ENQUIRE NOW

VAT No. 115 1416 58
Registration Number: 1449974