Replacement ABP Incineration Plant

We are in the process of finalising design details for a replacement of our existing animal by-products (ABP) incinerator at our Cambridge site. We have planning consent for the incinerator and intend to procure a facility with a capacity to incinerate up to 500kg per hour of ABP.

The incinerator will be equipped with state of the art features including:

  • 1600°C grade hot face refractory lining
  • Calcium silicate insulation
  • Temperature controlled burners
  • Hydraulically operated hearths in cascade
  • Forced combustion air
  • Excellent fuel efficiency

It is expected the facility will be operational in late 2017.

 

Customers

It is important that we have a service that is cost effective and consistent, but flexible enough to accommodate enquiries for varied waste types received from our customers. Novus Environmental have given us a service that has been both of those things and their customer services team are fantastic in their approach – helpful and knowledgeable.