Replacement ABP Incineration Plant

We are in the process of finalising design details for a replacement of our existing animal by-products (ABP) incinerator at our Cambridge site. We have planning consent for the incinerator and intend to procure a facility with a capacity to incinerate up to 500kg per hour of ABP.

The incinerator will be equipped with state of the art features including:

  • 1600°C grade hot face refractory lining
  • Calcium silicate insulation
  • Temperature controlled burners
  • Hydraulically operated hearths in cascade
  • Forced combustion air
  • Excellent fuel efficiency

It is expected the facility will be operational in late 2017.

 

Customers

We believe in using local companies for local services and Novus Environmental certainly fits this remit. We have used Novus Environmental for several years now and would not be persuaded to change to another supplier.