Menu
Strip

Replacement ABP Incineration Plant

We are in the process of finalising design details for a replacement of our existing animal by-products (ABP) incinerator at our Cambridge site. We have planning consent for the incinerator and intend to procure a facility with a capacity to incinerate up to 500kg per hour of ABP.

The incinerator will be equipped with state of the art features including:

  • 1600°C grade hot face refractory lining
  • Calcium silicate insulation
  • Temperature controlled burners
  • Hydraulically operated hearths in cascade
  • Forced combustion air
  • Excellent fuel efficiency

 

 

Customers

Quotes We recently changed to Novus Environmental for our incineration needs. We are world leading experts in powder filling and always have a great deal of clients material that has to be destroyed after testing. Novus Environmental always supply certificates of destruction - very much appreciated.